TAGA PROJECTS
Malinche, El Musical
PROJECT: Analytical Study of the structural elements of the assembly of the temporary theater for the realization of the show Malinche, El Musical.
Malinche is a musical project by Nacho Cano, with a spectacular and complex theatrical structure, with an area of approximately 6,545.20 m2 and a free height of 6m to 22.3m. The assembly of the Malinche show is projected with independent main structures, with stands, water, waterfalls, boat, and technical floor, among others.
Scenography made by the workshops Molla and Estudio Arte Herrador. Artistic direction and supervision by Hansel Cereza, co-founder of La Fura Dels Baus.
TAGA as Scenic Engineering provides its services to this project, through the structural development of the scenery and the technical direction of its execution. As well as the verification of the stability of the structural elements of the assembly, and the justification of its correct dimensioning and design according to the current applicable regulations.
CLIENT: Malinche El Musical.
LOCATION: Madrid
EXECUTION: 2021-22







