Dec 20, 2023
TAGA PROJECTS Rigging Points and Platforms for the Auditorio Nacional PROJECT: Rigging Points and Platforms for the Auditorio Nacional de Música. TAGA carries out the development, construction, and installation of two rigging points for motors in the mesh of the Main...
Dec 19, 2023
TAGA PROJECTS The Producers, Scenography Project PROJECT: Technical Project for the Construction and Assembly of the Scenography ‘The Producers.’ TAGA, as an expert in Scenic Engineering, conducts a thorough analytical study of the structural elements used...
Dec 14, 2023
TAGA PROJECTS La madre de Frankenstein, Certification of Scenography PROJECT: Structural Stability Study for the Set of ‘La madre de Frankenstein.’ Taga Scenic Projects conducts an analysis with the purpose of verifying, in accordance with current...
Dec 7, 2023
TAGA PROYECTS GRAN HERMANO VIP 8, CERTIFICATION AND LIFT MANUAL PROJECT: Certification and Safe Use Manual, and Risk Assessment for a Television Studio Lift. TAGA, as a Scenic Engineering firm, provides its services by documenting a scenic lift intended for the...
Nov 30, 2023
TAGA PROJECTS PROTECTIVE RAILINGS FOR THE TEATRO DE LA ZARZUELA PROJECT: Personal Protection Railing System. Taga, as a scenic engineering firm, specializes in the development, construction, and installation of custom pieces. On this occasion, it has manufactured and...
Este sitio web utiliza cookies para mejorar su experiencia. Asumiremos que está de acuerdo con esto, pero puede optar por no participar si lo desea. LEER MAS ACEPTO Privacy & Cookies Policy