Teatre Principal d’Inca – Technical Report Stage Fire Curtain
Teatre Principal d’Inca – Technical Report Stage Fire Curtain
Technical Report Stage Fire Curtain System Spain at Teatre Principal d’Inca
TAGA Proyectos Escénicos prepared a Technical Report Stage Fire Curtain System Spain, at Teatre Principal d’Inca, located in Inca, Balearic Islands, Spain. The purpose of the study was to assess the current condition of the fire separation system between stage and auditorium and to verify compliance with applicable fire safety regulations.
Commissioned by Ajuntament d’Inca, the project forms part of a broader technical review of active and passive fire protection systems within this public theatre in the Balearic Islands.
Technical Assessment of the Stage Fire Curtain System
The scope of the report included a detailed evaluation of the existing fire curtain installation, focusing on:
-
Closing performance and smoke tightness
-
Structural integration within the proscenium opening
-
Actuation and safety mechanisms
-
Compliance with the Spanish Building Code (CTE-DB SI)
-
Verification according to UNE-EN 1634-1 fire resistance standards
Fire resistance performance was analysed in accordance with EI60, EI90 and EI120 classifications. Both certified textile fire curtains and metal fire doors were assessed, considering their technical feasibility, economic impact and functional compatibility within the theatre’s stage engineering infrastructure.
Comparative Analysis and Regulatory Compliance
The technical report included a comparative assessment of alternative stage fire curtain systems, evaluating their structural compatibility with the stage house configuration and their integration with existing theatre machinery systems.
Key aspects analysed included:
-
Structural loads transferred to the existing building
-
Maintenance and inspection requirements
-
Integration with stage machinery
-
Public and performer evacuation safety conditions
The outcome of the study provides Teatre Principal d’Inca with a solid technical basis for decision-making, prioritising operational safety, system reliability and regulatory compliance within the context of theatre fire safety in Spain.
This project reinforces TAGA Proyectos Escénicos’ expertise in fire protection engineering for performance venues across Spain and the Balearic Islands, consolidating its experience in technical audits, regulatory compliance and stage compartmentation systems.
Client: Ajuntament d’Inca – Teatre Principal d’Inca
Location: Inca, Balearic Islands, Spain
Completion: 2025
OTHER PROJECTS
© TAGA PROYECTOS ESCENICOS SL 2026 | Aviso legal | Política de cookies | Política de privacidad | Política de calidad
© TAGA PROYECTOS ESCENICOS SL 2026 | Aviso legal | Política de cookies | Política de privacidad | Política de calidad







